At a glance
Completion Date:
Q3 2019
Construction Cost:
Confidential
No. of Units:
1000M sq
Client:
ESB Engineering & Major Projects
Architect:
ESB’s in house Architects
Contractor:
Moston Construction Ltd
Service provided:
Mechanical / Electrical / Sustainability / Energy
Director:
William Forsyth
State of the art facility constructed on brown field site, comprises a single storey repository with material processing, cold storage, administrative, research and exhibition facilities.
- The facility was designed, constructed and validated in accordance with British Standard PD 5454 Guide for the Storage and Exhibition of Archival Materials achieving BER A1 Near to Carbon Zero and BREEAM Excellent.
- The area is required to be maintained at a temperature of 4⁰C and with relative humidity levels between 30 and 35%.
- Inergen fire suppression system was installed in the archive storage room.
In 2020 the facility won the award for best innovation and sustainable design with the ACEI.
Project Gallery
START YOUR PROJECT
The content here gives you a general idea of the services we can provide but is limited by the requirements to edit Website content. If something sparks your interest or we can be of assistance please do get in touch below to see how the O’Connor Sutton Cronin energy can make a difference to your project! The right expert will reply on our behalf soon.