Goodluck Hope, Leamouth South

At a glance

Completion Date:

2022

Construction Cost:

£350M

No. of Units:

841 Rooms

Client:

Ballymore Group

Architect:

Allies & Morrison

Contractor:

Multiple

Service provided:

Civil / Structural

Director:

Martin McGrath

O’Connor Sutton Cronin was appointed as the structural and civil engineer for the Goodluck Hope project which is a new riverside neighbourhood located directly on the River Thames and the River Lea at the historic Leamouth Peninsula. The recently restored Grade II-listed Orchard Dry Dock at Leamouth South overlooks the O2 Arena.

  • The development includes 841 new homes, a brewery, residents’ club facilities, educational space, and over 23,000 sqm of retail, restaurants, and flexible workspace. 
  • As part of the works the river wall was improved and repairs were carried out to the existing dry dock wall.
  • The development consists of thirteen blocks ranging from four to thirty storeys and a 6000m2 basement consisting of car parking and plant rooms. The basement is formed via sheet pled walls and concrete slabs.
  • The six precast residential buildings comprise fully precast concrete construction consisting of precast concrete party walls and façade sandwich panels.

 

AWARDS WON

ACEI AWARDS 2023 : Overseas Category

Project Gallery

Want to know more?

Martin McGrath

martin.mcgrath@ocsc.ie

  • SHARE:

Related Projects

START YOUR PROJECT

The content here gives you a general idea of the services we can provide but is limited by the requirements to edit Website content. If something sparks your interest or we can be of assistance please do get in touch below to see how the O’Connor Sutton Cronin energy can make a difference to your project! The right expert will reply on our behalf soon.