At a glance
Completion Date:
December 2022
Construction Cost:
Confidential
Development Size
3,300mm²
Client:
Boston Scientific
Architect:
Butler Cammoranesi Architects
Contractor:
PJ Hegarty
Service provided:
Civil / Structural
Director:
John McBeath
O’Connor Sutton Cronin was appointed Civil and Structural Engineers for the Administration Building which is a three-story office block at the existing Boston Scientific site on Model Farm Road, Cork.
- The building consists of offices, meeting rooms, a canteen, and support areas. The site of the proposed building is located directly to the west of the existing Entrance Building to the Boston Scientific plant.
- There is a number of major services crossing the site of the building including foul sewers, storm drains, storm attenuation, process sewers, water mains, gas mains, and electrical and communication ducting.
- The building has been designed to achieve Gold LEED Certification, based on carbon, energy, water, waste, transportation, materials, health, and indoor environmental quality.
Project Gallery
START YOUR PROJECT
The content here gives you a general idea of the services we can provide but is limited by the requirements to edit Website content. If something sparks your interest or we can be of assistance please do get in touch below to see how the O’Connor Sutton Cronin energy can make a difference to your project! The right expert will reply on our behalf soon.