Limerick to Foynes Rail Line – TII Motorway bridges

At a glance

Completion Date:

2025

Construction Cost:

N/A

No. of Units:

N/A

Client:

Iarnród Éireann

Architect:

N/A

Contractor:

N/A

Service provided:

Civil/Structural

Director:

Brian Heron

The TII Motorway Bridges package formed part of the wider reinstatement of the Limerick-Foynes railway corridor, restoring a strategic rail connection between Limerick and Shannon Foynes Port.

The works focused on the complex interface between the reinstated railway and national road infrastructure. Careful engineering coordination was required to address bridge capacity, railway clearances, construction sequencing, inspection access and the safe integration of rail works within the wider motorway network.

Civil and structural engineering services included technical assessments of existing and proposed bridge structures, development of practical strengthening and renewal solutions, and detailed coordination between rail and road design requirements. The works helped manage the technical risks associated with reinstating a railway beneath and alongside major road structures.

The wider commission also encompassed associated railway infrastructure, including embankments, cuttings, drainage, overbridges, underbridges, culverts, formation works and boundary treatments. Close liaison with Iarnród Éireann, Transport Infrastructure Ireland and Shannon Foynes Port Company ensured that the bridge package aligned with operational railway requirements and national road standards.

This specialist infrastructure package demonstrated the value of integrated bridge, civil and rail engineering in delivering safe, buildable and compliant solutions on a nationally significant rail reinstatement project.

Project Gallery

Want to know more?

Brian Heron

Brian.Heron@ocsc.ie

  • SHARE:

Related Projects

START YOUR PROJECT

The content here gives you a general idea of the services we can provide but is limited by the requirements to edit Website content. If something sparks your interest or we can be of assistance please do get in touch below to see how the O’Connor Sutton Cronin energy can make a difference to your project! The right expert will reply on our behalf soon.